2024 Soma Bay, Hurghada Governorate , Egypt Infrastructure Detailed Design for Baywest Valley - Soma Bay, Hurghada
2024 Jeddah – Makkah , Kingdom of Saudi Arabia Rehabilitation, Development, and Capacity Enhancement of the Industrial Wastewater Treatment Plant in Jeddah
2023 Alexandria , Egypt Alexandria West Wastewater Treatment Plant (WWTP) Extension & Upgrade, Funded by The EIB
2022 Al Salam, Cairo , Egypt Conceptual Design for Extensions of the Main Screw Sewerage Lift Station (Kobri 3) - East Cairo
2021 Al Dhafra Region , United Arab Emirates Water Transmission Scheme from Madinat Zayed to Liwa and Qusahwira
2021 Abu Tig City, Assuit Governorate , Egypt Extension of Abu Tig Potable Water Treatment Plant - Assiut
2019 Soma Bay, Hurghada Governorate , Egypt Updating Infrastructure Master Plan at Soma Bay Resort - Hurghada
2018 Riyadh , Kingdom of Saudi Arabia Al Urubah Road Low‐Density Development Infrastructure Works - Riyadh, KSA
2017 Menofia, Gharbia and Damietta Governorates , Egypt Sustainable Rural Sanitation Services Program (SRSSP), Funded by The World Bank
2017 6th of October City, Giza , Egypt Social Housing (1185 Buildings) Infrastructure Works - 6th of October City
2016 Riyadh , Kingdom of Saudi Arabia Al Aquiah Road Low‐Density Development Infrastructure Works - Riyadh, KSA
2016 New Ismailia City , Egypt Master Plan for Tertiary Treated Wastewater System - New Ismailia City
2015 Greater Cairo , Egypt Updating the Master Plan of Sewage Projects for the East Bank Sector - Greater Cairo
2012 Jeddah, Kingdom of Saudi Arabia , Kingdom of Saudi Arabia Masharef 2E Community Infrastructure Works - Jeddah, KSA
2009 Ain Shams - Cairo , Egypt Consulting Services, Reviewing Detailed Design and Construction Supervision for Ain Shams wastewater pump station expansion with capacity 600,000 m3/day and new 8.3 km of 1500mm Pre-Stressed R.C Forcemain Pipeline.
2005 / 2017 (Over Many Phases) New Cairo City , Egypt The infrastructure works for the extension of the Rehab city (the districts no. Six, Seven, Eight, Nine, and Ten)
October 2009 10th of Ramadan City , Egypt Design Review and Construction Supervision of water and wastewater projects in some areas in 10th of Ramadan City
August 2009 Al-Senbelaween city – Al-Dakahleya Governorate , Egypt Design Review and Construction Supervision of Al-Senbelaween water treatment plant Expansion
August 2009 El- Waleedyah city -Assiut , Egypt Consulting services, Reviewing designs and construction Supervision of El-Waleedyah water treatment plant (52,000 m3/day)
February 2009 Al-Obour & Al-Shorouk, Cairo , Egypt Consulting Services, detailed design drawings, Technical Support for the construction company for Pump Station at Al-Obour 30 km. Transmission Pipe line, from Al-Obour
February 2009 Al-Obour City, Cairo , Egypt Consulting Services, detailed design Drawings, Technical Support for the construction company for intake, 10 km of 1800 mm pre-stressed R.C. Transmission Pipe line and Intermediate R
August 2008 El-Khartoum City , Sudan Construction Management and Supervision for Infrastructure Works for El-Madena El-Khadra – El-Khartoum – Sudan (800 Feddan)
July 2008 Ismailia Government , Egypt Consulting services, Reviewing designs and construction Supervision of Water & Wastewater Projects at Ismailia Governorate.
March 2007 Helwan, Cairo , Egypt Design, review and construction of Water Treatment Plant Project Kafr El-Elw – (400,000 m3/Day) Helwan - Egypt
September 2007 Suez – Ismailia – Port said , Egypt Preparation of water and wastewater master plan for the Canal cities
September-2007 Tahta - Sohag - New Sohag - Gerga - Balyana - etc. , Egypt Preparation of water and wastewater master plan for the Sohag Governorate
June 2007 6th of October – El Sheikh Zayed – El Obour – Badr – El Shorouk New Cairo – 15th of May , Egypt Preparation of water and wastewater master plan for the new cities surrounding Greater Cairo
June 2006 Greater Cairo (Cairo - Helwan - Giza) , Egypt Preparing the future Master Plan of the sewage projects for the Greater Cairo
Sept. 2005 -2017 El Rehab City, Cairo , Egypt Preparing Studies, Detailed Design for Infrastructure Works of El Rehab City 6th, 7th, 8th, 9th and 10th Stages.
Sept. 2003 Sokhna Port – Red Sea , Egypt Development of Sokhna Port and Logistics Center to become the interface for import and export cargo flows serving the Suez special Economic Zone
June, 2003 Armant City, Qena Governorate. , Egypt Reclamation & Irrigation for Armant Farm using the Treated Water of Wastewater Treatment Plant
June, 2003 Alexandria – Cairo Road at km 40 - Al Amria , Egypt Design Review and Construction Supervision of AL Amria Water Treatment Plant
November 2001. Al-Ahsaa industrial city is located beside Oyoun city, 28 km from El-Hefoof city, at Dammam Road entrance-Eastern Region, Kingdom of Saudi Arabia. , Kingdom of Saudi Arabia Consulting Services, detailed design Drawings, implementation of Wastewater Treatment Plant of Al-Ahsaa Industrial City.
August 2000 Meet Ghamer-Dakhaliya Governorate. , Egypt Preparing Studies and Detailed Design of Wastewater Project for Meet Ghamr – Dakhlia Governorate .
February 2000. Nubaria area nearly 70 km south of Alexandria bounded from the west by the Cairo-Alexandria desert highway. , Egypt Nubaria dairy farm. - Nubaria dairy complex (Almarai).
Oct. 1996. Dreamland Resort 6th of October city , Egypt Irrigation and subsurface drainage systems for Dreamland Resort.
Jan. 1987 Marina El-Almain Tourist Center-western north coast "Km 94 - 100". , Egypt Turf Irrigation System for Marina El-Almain Tourist Center.
EI-Obour New City - 15th of May new city - EI-Shorouk new city , Egypt Meteorological Hydraulic and Hydrological studies for runoff studies and designs the protection civil structures against runoff hazards.
January,.2021 Cairo-Alexandria Desert Road – Borg El Arab International Airport , Egypt The Western Arc of The Ring Road Alexandria Governorate, with a length of about 20 km
December, 2016 South of 6th of October city , Egypt Development, design and construction of the main corridors for the third sector of the ring road at 6th of October city
Nov. 1999. Dreamland Resort - 6th of October city (Area 350 Feddans). , Egypt Construction Management and Supervision for Infrastructure Works Golf Resort- Dreamland.
November 1998. East of Port Said City. , Egypt Design, Construction Management and Supervision for Infrastructure of the Free Industrial Zone Development Project.
May 2004 El-Khartoum City , Sudan Construction Management and Supervision for Infrastructure Works Dreamland Residential City- El-Khartoum – Sudan (1200 Feddan)
Oct. 1996. Dreamland resort – 6th of October city (Area: 2200 feddans). , Egypt Roads Network for Dreamland Resorts.
Feb. 1992. Egyptian northern coast on the Mediterranean Sea. , Egypt The International Northern Coastal Highway.
July 1988. Egyptian northern coast on the Mediterranean Sea. , Egypt Determination of the International Northern Coastal Highway Path.
May 1981. Subdivision of the city of the 15th of May, Helwan. , Egypt Road Network for the Extension of the City of the 15th of May-Helwan.
Nov. 1984. The western northern coast (Km 94 – Km 100). , Egypt The Road Network for Marina El-Allamain Tourist Center at the North Coast.
Feb. 1991. 6th October City. , Egypt Irrigation and Drainage networks for a pilot project (500 Acres) farm using treated sewage water in 6th October City.