- starting date
- June, 2003
- progress
- Completed
- Location
- Alexandria – Cairo Road at km 40 - Al Amria , Egypt
- client
- Ministry of Housing and Reconstruction
Brief Description
The project involved the comprehensive review and supervision of the design and construction of the Al Amria Water Treatment Plant. Services included the assessment of preliminary designs, technical specifications, method statements, and implementation schedules. The review extended to topographic surveys, geotechnical investigations, and detailed design drawings across all disciplines, including hydraulic, electromechanical, instrumentation and control systems, structural, and architectural components for a pump station with a capacity of 260,000 m³/day. The scope also included water hammer protection analysis, verification of the Bill of Quantities, and construction supervision.
