- starting date
- 2021
- Location
- Abu Tig City, Assuit Governorate , Egypt
- client
- Metito Water Treatment Egypt
Brief Description
| Prepare the hydraulic, mechanical, and electrical designs, along with site infrastructure works, for the extension of the Abu Tig Water Treatment Plant to increase its capacity by 500 L/sec—bringing the total plant capacity to 1,000 L/sec (equivalent to 86,400 m³/day). This extension is undertaken within the framework of the presidential initiative Hayah Karima |
