- starting date
- May 1989
- progress
- Completed
- Location
- ESNA, Egypt , Egypt
- client
- Ministry of Public Works and Water Resources
Brief Description
The project involved the review and approval of the hydraulic design for the ESNA Barrage, including its spillway, powerhouse, and navigation lock, to ensure compliance with engineering standards and hydraulic performance criteria. It also included supervision of the construction and performance evaluation of the physical hydraulic model used to simulate flow conditions and optimize the design under various operational scenarios.
