Tazz International Airport

starting date
2004
Location
Yemen , Republic of Yemen

Brief Description

As the lead engineering consultancy for the project, our specialized teams took full responsibility for the critical technical phase. We conducted the comprehensive preparation of preliminary studies to assess the airport’s infrastructure and performed all necessary testing, including geotechnical investigations and pavement assessments. Following a detailed analysis of the results to determine the optimal engineering solutions, our experts then proceeded with the preparation of the detailed technical specifications and tender documents. These formed the core technical basis for the rehabilitation of the runways and aircraft pavements (taxiways and aprons), ensuring all works were executed in full compliance with international standards and aviation safety requirements.