- starting date
- Oct. 1996.
- progress
- Completed
- Location
- Dreamland resort – 6th of October city (Area: 2200 feddans). , Egypt
- client
- Dreamland Company-Bahgat Group.
Brief Description
Design and construction supervision of the resort’s roads.
The road length is about 150 Km and it ranges from main collectors (6 lanes – 20 m width) to service roads (2 lanes – 7.5 m width).
