- starting date
- May 1981.
- progress
- Completed
- Location
- Subdivision of the city of the 15th of May, Helwan. , Egypt
- client
- The Arab Bureau for Design and Technical Consultations-Ministry of Housing and Reconstruction.
Brief Description
Design of the road network for the whole town includes the main roads, branches and the service roads, with total length of about 35 Km.
