Preparing Studies, Detailed Design for Infrastructure Works of El Rehab City 6th, 7th, 8th, 9th and 10th Stages.

starting date
Sept. 2005 -2017
progress
Many Phases
Location
El Rehab City, Cairo , Egypt
client
Talaat-Mostafa Co.

Brief Description

This project involved the preparation of comprehensive infrastructure development plans for the 6th to 10th stages of El Rehab City. The services included demographic studies, and the development of a master plan covering all infrastructure systems: roads, potable water supply, wastewater collection, green area irrigation, power supply and lighting, and telecommunication networks. The scope also included the planning, conceptual and final detailed design of all systems, along with the preparation of tender documents and technical specifications