- starting date
- Sept. 2005 -2017
- progress
- Many Phases
- Location
- El Rehab City, Cairo , Egypt
- client
- Talaat-Mostafa Co.
Brief Description
This project involved the preparation of comprehensive infrastructure development plans for the 6th to 10th stages of El Rehab City. The services included demographic studies, and the development of a master plan covering all infrastructure systems: roads, potable water supply, wastewater collection, green area irrigation, power supply and lighting, and telecommunication networks. The scope also included the planning, conceptual and final detailed design of all systems, along with the preparation of tender documents and technical specifications
