Nile’s West Bank Sanitary Drainage Master plan

starting date
April 2009
progress
Completed
Location
Giza Governorate , Egypt
client
The Construction Authority of Portable Water and Wastewater (CAPW)

Brief Description

The project comprised a comprehensive assessment of the existing sewerage network along the Nile’s West Bank, evaluating the system adequacy in light of future population growth. It included a capacity and operational review of the Abu Rawash and Zeneen WWTPs (1.5 million m³/day total), and examined the feasibility of rerouting main sewers to a proposed southern pumping station. The design featured two 1500 mm diameter forcemains conveying flows to the planned 600,000 m³/day Shabrament WWTP. Full tender documents were prepared to support project implementation.