Unit III Water Transmission Scheme (Lot A) – Abu Dhabi, UAE

starting date
2023
progress
Completed
Location
Abu Dhabi , United Arab Emirates
client
Société Egyptienne D'Entreprises (SEDE)

Brief Description

  • Extend the existing New Pumping Station at Unit III (AUH) to achieve a capacity of 48 million imperial gallons per day (MIGD), enabling transmission of flows to new interface points along the pipeline, existing interface points within the Unit IV area, and the newly proposed Unit V Pumping Station. The scope includes all necessary interconnection works with the existing transmission pipelines at Unit III Pumping Station.
  • Construct a new DN1200 mm transmission pipeline, approximately 43 kilometers in length, equipped with a Fiber Optic Cable (FOC), extending from the newly proposed pumping station or group at Unit III to the Unit IV area. This includes all associated interconnections with existing pipelines.
  • Install a new DN1000 mm pipeline with integrated FOC, branching from the DN1200 mm main line and extending towards the Unit V Pumping Station.