- starting date
- March 2007
- progress
- Completed
- Location
- Helwan, Cairo , Egypt
- client
- The Construction Authority of Portable Water and Wastewater (CAPW)
Brief Description
The project involved comprehensive consulting services for the Kafr El-Elw Water Treatment Plant with a capacity of 400,000 m³/day. The scope included review of the preliminary design, technical specifications, method statements, and project schedules. It also covered topographic and geotechnical assessments, detailed hydraulic, electromechanical, structural, and architectural design reviews, as well as analysis of groundwater control systems and water hammer protection. The services concluded with a thorough review of the Bill of Quantities and full construction supervision.
