- starting date
- 2009
- Location
- Ain Shams - Cairo , Egypt
- client
- The Construction Authority of Portable Water and Wastewater (CAPW)
Brief Description
The project involves providing consulting services for the review of detailed designs and construction supervision for the expansion of the Ain Shams Wastewater Pump Station to a capacity of 600,000 m³/day. The scope also includes the supervision of the construction of a new 8.3 km long, 1500 mm diameter pre-stressed reinforced concrete (R.C.) forcemain pipeline. The project aims to accommodate increasing wastewater flows resulting from urban growth and improve the efficiency and reliability of wastewater conveyance in the Greater Cairo region.
