Consulting Services, detailed design Drawings, Technical Support for the construction company for intake, 10 km of 1800 mm pre-stressed R.C. Transmission Pipe line and Intermediate R

starting date
February 2009
progress
Completed
Location
Al-Obour City, Cairo , Egypt
client
The Arab Contractors

Brief Description

The project comprised detailed design and technical support for the expansion of the El-Obour Water Treatment Plant, with a capacity of 440,000 m³/day. It included assessment of raw water sources, topographic and geotechnical surveys, and complete design of a new shore intake, intermediate pump stations, and a 10 km long, 1800 mm pre-stressed concrete transmission pipeline. The scope also covered design of four valve chambers for connection to existing lines, surge protection (water hammer analysis), SCADA system design, and construction support.