Design and implementation of a transmission pipeline along the Abu Dhabi–Sweihan Road with an approximate length of 20 km, comprising pipe diameters of 1200 mm and 1600 mm, including all required control and instrumentation systems at interface points with Transco transmission lines.
Design and construction of an additional 2 km branch connection from the twin DN900 pipeline linking the UAN and Unit IV Pumping Station.