Design, review and construction of Water Treatment Plant Project Kafr El-Elw – (400,000 m3/Day) Helwan – Egypt

starting date
March 2007
progress
Completed
Location
Helwan, Cairo , Egypt
client
The Construction Authority of Portable Water and Wastewater (CAPW)

Brief Description

The project involved comprehensive consulting services for the Kafr El-Elw Water Treatment Plant with a capacity of 400,000 m³/day. The scope included review of the preliminary design, technical specifications, method statements, and project schedules. It also covered topographic and geotechnical assessments, detailed hydraulic, electromechanical, structural, and architectural design reviews, as well as analysis of groundwater control systems and water hammer protection. The services concluded with a thorough review of the Bill of Quantities and full construction supervision.